Large
video
Large

Large Steel Structure Workshop Factory

Today, steel building is the most flexible solution in the modern world of construction, thanks to its proven significant benefits:
Produced, engineered and constructed faster than conventional building

Product Introduction

Light steel structure workshop

 

Today, steel building is the most flexible solution in the modern world of construction, thanks to its proven significant benefits:

Produced, engineered and constructed faster than conventional building

Resistance to climate changes and natural disasters

Light in weight but have more tensile strength, and can be used together with other construction materials

More flexible in terms of designs and applications

Cost-saving

Environment-friendly and NO WASTE

 

image001

 

Specification:

 

column and beam

material Q355 H section steel (painted or galvanized)

surface treatment

galvanized or painted

wall&roof purlin

c or z section steel

wall&roof panel

colorful corrugated steel sheet, sandwich panels with eps, rockwool, fiber glass, pu etc.

support

steel angle, steel pipe, steel round.

gutter

steel sheet or galvanized steel sheet

downpipe

pvc pipe

door

sliding sandwich panel door or rolling metal door

window

pvc or aluminum alloy windows

accessory

anchor bolt, high strengthen bolt, normal Bolt, skylight Belts, ventilators, etc.

 

image003

 

Details

 

image004

image005

 

Characteristics


1. Wide span: single span or multiple spans, the max span is 36m without middle column
2. Low cost and maintenance: unit price range from USD35/m2 to USD70/m2 according to customers request
3. Fast construction and easy installation: time saving and labor saving
4. Long using lifespan: up to 50 years
5. Nice appearance
6. Others: environmental protection, stable structure, High quake-proof, water proof and fire proof, and energy conserving.

 

image006

image008

 

Quality is the guarantee of our long-term survival. With us, you can quickly build your blueprint!

 

Fixed packing, loading, transportation, unloading the matters needing attention:

 

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

 

image012
image013
image014

 

FAQ

 

1. What's the quality assurance you provided and how do you control quality ?

Established a procedure to check products at all stages of the manufacturing process - raw materials, in process materials, validated or tested materials, finished goods, etc.

 

2. Do you offer guiding installation on site overseas for warehouse building?

Yes, we can provide the service of installation, supervision and training by extra. We can send our professional technical engineer to supervise installation on site overseas. They have succeeded in many countries, such as Iraq, Dubai, South Africa, Algeria, and Ghana.

 

3. What is your main market?

Guided by global field of vision, our products have been exported to many countries and regions with its good quality and good service, such as France, UAE, South East Asia, Africa and so on. We will be glad to establish sincere business cooperation with you in the near future.

 

4. How to pack the products?

We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

 

image016

Hot Tags: large steel structure workshop factory, China large steel structure workshop factory manufacturers, factory, Steel Structure Frame Workshop, Modern Light rigid Structure Workshop, Light Steel Structure Workshop, Steel Structure Factory Buildings, Quality Steel Workshop Plant, Steel Structure Workshop

You Might Also Like

(0/10)

clearall